Написать заметку для себя
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть
Исатай33 года, Атырау, Инженер-проектировщик
за 350 тг
Давно не обновлялось
Соискатель давно не обновлял своё резюме, возможно, он прекратил активные поиски работы.
Инженер-проектировщик
полная занятость
Опыт работы
3 места за
6 лет
и 6 месяцев
WOOD KSS (PSN KAZSTROY)
март 2019 — ноябрь 2019
Инженер-проектировщик
Project/Client: NCOC & TA Scope Project. Developed piping general arrangement drawing, piping and equipmentlayout, MTO & Piping Isometrics, 3D modeling (by PDMS). Supported engineers & draftsman with initial and final design solutions. Support selection, MTO and support markup for Process and Utility pipingand exposure to stress (CAESARII) analysis. Facilitated onsite design solutions, verified the contractual requirementsof scope of work and managed changes on the project. Attended weekly progress meeting with the development team andensured that problems and requirement that required input from otherdisciplines were fully explained and expedited.
ERSAI CASPIAN CONTRACTOR LLC
октябрь 2016 — январь 2018
Инженер-проектировщик
Project/Client: TCO & FGP (Future Growth Project). Read and modify drawings, isometric projection and 3D modeling. Prepare drawings, implement change and As Built. Modify 3D Model of Pipe Rack by Tekla Structures. Developed piping general arrangement drawing, piping and equipmentlayout, MTO. Modify Piping Isometrics for fabrication. Compilation of material specifications and requirements specification forthe design. Materials Selection aligning them with customers. Inspection of the site (pipe supports, flanges, wedeled) in line with thepresence of P&ID piping, mechanical equipment. Control and management of the fabrication process.
«SINOPEC Engineering» (Group) Co., Ltd
июнь 2012 — октябрь 2016
Инженер-проектировщик
Project/Client: Atyrau Refinery & CPA Project. Monitoring the progress of the assembly and installation of pipe (andunderground pipe) in according to design documentation: isometrics andpiping engineering drawings. Preparing test packs and checking the hydrotest process of pipe. Preparing schema of hydrotest process which showing where should bemanometers, etc. Monitoring the progress of the installation of tank, pump and columnaccording to equipment engineering drawingsPreparing test packs and checking the pump test stand process. Development work performance project. Monitoring the progress of the assembly and installation of tank (from2000 m3 to 10000 m3) in according to structural engineering drawings. Preparing technical documentation and checking hydrotest process. The development of the master plan, technological maps and timetablefor: installation of the tank IT.
Казахский — свободно владею
Русский — свободно владею
Английский — свободно владею
Китайский — начальный уровень
Гражданство: Казахстан
В избранное
Скачать
Скрыть
Пожаловаться
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть