Написать заметку для себя
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть

Mohammed Javeed65 лет, Алматы, Engineer
за 350 тг
Engineer
2 000 000 KZT
Cathodic ProtectionCorrosionOil & Gas orojects
полная занятость
Профессиональные навыки
Cathodic Protection Expert for Pipelines, Tanks
Опыт работы
5 мест за
38 лет
и 9 месяцев
SICIM
сентябрь 2023 — февраль 2026, Taif
Cathodic Protection Inspector
● ARAMCO - Current Project
o Master Gas Expansion Phase III
▪ 315 Km of 56” pipeline
▪ 38 Km of 10” pipeline
▪ 37 Km of 18” pipeline
▪ 02 no’s of water tank
▪ 18 nos of block valve station / consisting of RTU, JB RacksGOV &MOV, switch rack, power transformers, lighting, earthing and associated circuitry
▪ Temporary and Permanent CPS
a) Sacrificial & ICCP (36 DGB), test stations, bonding boxes, transformers, corrosion coupons, Interference testing
● ARAMCO - Completed Project
o Upgrade Uthmaniyah Abqaiq Pipeline Project
▪ 65 Km of 40” pipeline
▪ 09 Km of 12” pipeline
▪ 8 no’s of block valve station / consisting of Solar Panels. Battery banks, RTU, JB RacksGOV &MOV, switch rack, power transformers, lighting, earthing and associated circuitry
▪ Temporary and Permanent CPS
b) Sacrificial & ICCP (4 DGB), test stations, bonding boxes, transformers, corrosion coupons, Interference testing
CAPSA Engineering and Contracting Company - UAE
март 2023 — июнь 2023, Abu Dhabi
Cathodic Protection Engineer
Working on Engineering deliverables for
o SWI pipeline for ADNOC – RRE
o Business Continuity Package – Containerized Substation
o ASR GAS FACILITIES PACKAGE1 in UAE
Consultants to Contractors in India and ILF - KSA
январь 2019 — февраль 2023, Mumbai
Consultant
· Design review, documentation &trouble shooting and report
generation.
· Saline Water Conversion Corporation (SWCC) in KSA
o 464 Km cumulative length of 84”, 80” & 68” pipelines
o 12 Nos of large AST
Dodsal Const & Engg PTE Ltd. – EPC Contractor - UAE
январь 2008 — январь 2019, UAE
Manager Cathodic Protection and Electrical
Projects with International Companies
● ARAMCO
o MASTER GAS EXPANSION – PHASE I – Yanbu–Rabigh–PS-11
▪ 358 Km of 56” pipeline
▪ 18 nos of block valve station consisting of solar panels, battery banks, RTU, GOV & MOV, power transformers, power panels, lighting, earthing and associated circuitry
▪ Temporary and Permanent CPS
Sacrificial & ICCP anodes, test stations, bonding boxes, deep well ground beds, transformers, corrosion coupons
● GASCO
o HabshanMaqtaTawellah Pipeline (HMT)
o Habshan Sulphur Granulation Project (HSGP)
o Asab Lean Gas line pipeline (ALP) Thammama-C to ASAB
● TRANSCO
o Fujariah to Al-ian pipeline (FWTS2)
● TAKREER
o Inter Refinery Pipeline Project (IRPP-1) RRD to ADR Refinery
Summary of Installation, testing and commissioning of electrical & CPS in above projects: -
· 789 Km of 10”, 12” and 16” pipelines
· 654 Km of 52” & 42” pipelines
· 65 Km of 40” pipeline
· 358 Km of 56” & 30” pipelines
· 131 Km of 64” pipeline
· 94 Km of 36” pipeline
· 24 Km of 4” pipeline
· 30 no’s of large AST
· 15 Km of buried plant piping
· 39 no’s passive cooled shelter, solar panels, battery banks, RTU, ROV and associated circuitry / equipment’s at block valve stations
· 43no’s of deep well ground bed with Transformer & associated switchgears
· Concrete corrosion monitoring system
Scope of work in above projects
- Installation, testing and commissioning of transformer, switchgears, solar panel, battery banks, regulation unit, RTU, GOV, MOV and associated circuitry. Laying of power and control cables, trays, MCC / PCC panels, earthing grids
- Installation, testing and commissioning of temporary and permanent CPS for pipeline, plant piping, large AST and HVAC mitigation measure
- Installation and commissioning of tanks instrumentation (level, temperature, overfilling – Guide wave Radar, Magnetostrictive
- Review of electrical and Instrumentation diagram, temporary and permanent CP design for pipelines, tankages, preparation of MS, commissioning reports and task risk assessment
- Liaison with third party for tie in of electrical power, hooking up in FOC network, SCADA, foreign pipeline owner / High tension power line company for crossing, parallelism, interference testing & commissioning
- Identify and quantify total number of engineering deliverables, man-hour allocation, format of delivery and time schedules
- Planning and strategize work plan based on overall project execution plan
o Provide consultancy services to other projects of the company on design review, commissioning and report generation
o Lead a team of electrical & CP personnel and act as interface between management and technical team.
Saline Water Conversion Corporation (S.W.C.C.) - KSA
декабрь 1986 — январь 2008, Al Khobar
Cathodic Protection Foreman
Scope of work
● Review cathodic protection design and procedure documents, highlight problems, suggest up grading, modifications and to ensure the quality implementations for the existing and new CPS projects
● Monitoring and maintenance of cross-country pipelines, buried plant piping, offshore structures, sea water screening and pumping station, distribution channels, large above ground storage tanks (oil and water), turbine condenser.
● Conducting surveys DCVG, CIPS for cross country pipelines
● Technical assessment and interpretation of field data and recommend changes in operating parameters and monitoring/inspection programs
● Preparation and delivery of annual and periodic reports, corrosion status of systems and assessment of trends from surveys Rehabilitation of complete sea water Intake building C.P. system (240 MMO anodes)
● Investigation of failure of ICCP and Sacrificial CP System and recommending remedial action for avoid future failures
● Supervise and inspect on-going project for the CP System Gas Pipeline Network.
● Review CP documents submitted by the contractor
● Fully familiar with NACE recommended practices, Industrial permit to work system, Industrial fire-fighting and safety procedures.
● Ensure that procedures for the safe execution of tasks are in place and adhered to (including Task Instructions, Permits-to Work,
Task Risk Assessments, Toolbox Talks).
● Worked on Electrical control circuit and interlock for Switching operation, Protection trip, interlock of Pumps, Switchgears, Generator and Transformers.
● Cable laying, cable termination and cable fault detection
● Calibration, Installation of transmitter / transducer, field instrument, actuator, setting of limit switches, logic / loop checking
Образование
Высшее
M.H.S.S.Polytechnic
Высшее
Electrical Engineering
Electrical
1977 — 1981
Diploma in Electrical Engg
Повышение квалификации, курсы
Cathodic Protection Level 2
2013
NACE - USA
Corrosion Technologist
2012
NACE
Английский — родной
Гражданство: India
В избранное
Скачать
Скрыть
Пожаловаться
В избранное
Скачать
Скрыть
Пожаловаться
Свернуть



